Monday, December 16, 2013

Benchwork Main room




Benchwork in the main layout room also went straight forward with IVAR shelves along the four walls.



In the middle of the room I installed the benchwork for a peninsula. The track curves are all 30" radius.


I did a lot of trying until the shelves had their final position. Then I secured the shelves with 1x2's


The subroadbed above at left will be San Clemente, at right Oceanside (OK at this stage its hard to figure out)


This is the framework for the peninula


As you can see, I had to use every bit of free space to temporarily store my supplies, until all the benchwork was ready.

No comments:

Post a Comment